Liên hệ chúng tôi +84 236 365 9005
Project
Dung Quat Oil Refinery
Construction of access road for super heavy crane at Dung Quat Refinery project |
Casting pre-stressed girders at construction yard | |
Construction of RCP (2D2.4m) drainage sustem | Construction of RCP (2D2.4m) drainage sustem | |
Construction of RCP (2D2.4m) drainage sustem | Construction of RCP (2D2.4m) drainage sustem | |
Construction of RCP (2D2.4m) drainage sustem | Construction of RCP (2D2.4m) drainage sustem | |
Construction of RCP (2D2.4m) drainage sustem | Construction of Sleepers for Oil Pipe System | |
Construction of Sleepers for Oil Pipe System | Retaining wall for slop protection | |
Installation of reinforcement steel for pre-cast columns |
Stockpiling of pre-cast columns |
|
Erection of pre-cast columns | Erection of pre-cast columns | |
Construction of underground Drainage System | Construction of underground Drainage System | |
Manhole Casting |
Manhole Casting |
|